Grunt task to extract & inline critical-path CSS from HTML
-
Updated
Feb 13, 2023 - HTML
Grunt task to extract & inline critical-path CSS from HTML
Open Source Architecture Code Analyzer
Inline critical path CSS and async load existing stylesheets
Eliminate render-blocking CSS in above-the-fold content
A browser widget to extract Critical CSS and Full CSS from a page. Can be used via the browser console.
MATLAB implementation of all the Operations Research algorithms and problems solved by me.
High performance critical css extraction with a great configuration abilities
Finding critical path on large graph using Bellman-Ford algorithm with parallel implementations
Java application designed to solve the Critical Path Method (CPM) problem.
Client for critical-css-server. Eliminate render-blocking CSS in above-the-fold content.
Get critical (above-the-fold) and the rest CSS using Puppeteer
Enumeration of all Permutations (Recursion, Single Swap, and in Lexicographic Order), and Combinations. Enumeration of all Topological Orderings on a Directed Graph. Enumeration of all Paths in a connected Graph. Evaluates Critical Path using PERT Algorithm.
Graphical Java application using implementation of critical path analysis for optimal day planning.
System that finds the critical path of the graph of the disciplines of the Computer Science course at UnB (University of Brasília).
Detects Above the Fold styles on sites and assembles a stylesheet of them.
Udacity: Front End Web Development Project - "Website Optimization"
The easiest way to achieve critical path CSS
run critical path generator in a docker container
Offline-first PWA card game
Add a description, image, and links to the critical-path topic page so that developers can more easily learn about it.
To associate your repository with the critical-path topic, visit your repo's landing page and select "manage topics."