And Innovative Structural and Specialty Engineering //innovstructure.com was also thrilled to be a part of the JFKNTO team as the independent peer reviewers for JFK New Terminal One, the largest terminal on the airport campus. Thank you AECOM Tishman for giving us the opportunity to provide a second eye on Thornton Tomasettis design of this complex structure. Congratulations to Tishman, TT, John Barry and the team under his leadership. #leadership #structural #opportunity #structuralengineering #airportdesign #architecturedesign #architecturaldesign #airports #innovative #amazing
The JFK New Terminal One (JFK NTO) project team headed out to JFK airport on Monday to watch the first steel go up for the headhouse. Thornton Tomasetti took over as EOR for the terminal on February 17, 2022. It has been an incredible effort, which included 150 people from multiple offices and practices, to get the first steel erected on site 14.5 months after starting design. The completely new $4 billion international terminal's first phase is scheduled to open in 2026. Phase A will include 14 gates and 1.85 million square feet of floor area. Thornton Tomasetti is providing multiple services: structural engineering, protective design, façade engineering, construction engineering and applied science. Thanks to our great partners Gensler and AECOM Tishman for bringing us onto this project. Truly a team effort!