Dirt is moving on the newest United-Blythe JV project. The SC 160 and I-77 Interchange Reconfiguration Project is located in Fort Mill, SC and was described by former Secretary Hall as "a very unique interchange design." The project will reconfigure the existing diamond interchange at Exit 85 to improve access between SC 160 and I-77. The new configuration is called an offset direction interchange, which will not only reduce left-turn issues on SC 160, but will also improve intersection spacing and reduce congestion on SC 160. This will be the first of its kind in South Carolina. The project will also widen over one mile of SC 160 through the interchange from US 21 to Pleasant Road. (Article) https://lnkd.in/efvA7buC
United Infrastructure Group
Construction
Great Falls, South Carolina 4,198 followers
A leading Southeast Contractor with expertise in Engineering, Construction, and Progressive/Alternative Project Delivery
About us
Celebrating 100 years in 2024, United Infrastructure Group is one of the leading firms in the Southeast with expertise in engineering, construction, and progressive/alternative project delivery methods for transportation infrastructure projects. UIG’s strength is founded on a culture of safety, quality, and innovation coupled with an unyielding commitment to performance bolstered by our mission to foster growth and diversity in resources and disciplines by developing and motivating exceptional leaders in a Christian environment to achieve excellence by every standard of measure. UIG has an extensive depth of resources and unparalleled construction services including: •Bridge rehabilitation, replacement, and new construction of marine, interstate, interchange, and secondary road bridges •Interstate widening, repair, and construction •Site grading •Paving, resurfacing, and road maintenance •Multi-level roadways •Railroad and intermediate bridges •Drainage Improvements •Bridge painting/coating
- Website
-
http://uig.net/
External link for United Infrastructure Group
- Industry
- Construction
- Company size
- 501-1,000 employees
- Headquarters
- Great Falls, South Carolina
- Type
- Privately Held
- Founded
- 1924
- Specialties
- Design-Build, Heavy Highway and Bridges, Demolition, Engineering, Alternative Project Delivery, Progressive Project Delivery, Emergency Operations, Southeast, and Construction
Locations
-
Primary
5562 Pendergrass Blvd
Great Falls, South Carolina 29055, US
-
3800 Arco Corporate Dr
Suite 200
Charlotte, North Carolina 28273, US
-
3540 Charleston Hwy
Orangeburg, South Carolina 29115, US
Employees at United Infrastructure Group
Updates
-
A new bridge on US 301 southbound over the South Edisto River in Orangeburg County is now open to traffic. Crews are now working to complete the project, which includes paving and placement of pavement markings on this stretch of highway. As crews finish up construction this month, SCDOT asks drivers to use caution and to look out for temporary lane closures in both directions.
-
UIG 2024 Summer Intern Day at TopGolf⛳️ Our interns have been learning a lot and working hard on our job sites this summer from Georgia to North Carolina, so we thought it was time for them to have some fun and get together for an afternoon of networking, food and TopGolf. #summerinternships #civilengineeringinternship #constructionmanagementinternship #uiginternshipprogram #internshipptogram #constructioninternship #uig
-
The Palmetto Parkway Interchange at Exit 81 off I-77 in Rock Hill, SC was fully opened to traffic yesterday afternoon. Great job to the United-Blythe JV opening the road before the holiday! #UBJV #SCDOT #CityofRockHill #PalmettoParkway
-
Ashlie, we love having you as part of our United Family! We look forward to watching you grow and achieve greatness in the industry.
My career path has not been traditional at all, but after 4 years in the US industry and over 15 years in construction, my passion and efforts have taken me great places. Today I celebrate 1 year as a member of the United Infrastructure Group family, and I cannot be more grateful for the amazing opportunity they have given me, I look forward to continuing learning and building my career with such an amazing company and teammates.
-
+4
-
Great job UIG team.
Jaylan Burchell and his crew standing and driving piles last Friday afternoon on the I-26 widening project. Great work, guys. Robert West Banks Construction Company
-
Project Update in Dorchester County with Banks Construction Company and UIG as a bridge subcontractor on Berlin G Myers 7 bridges. Integral Pier Caps have been poured at Bridge 4 and all of the caps on Bridge 5 are complete. All approach slabs and decks have been poured at Bridge 6 and 7. All Barrier walls have been poured on Bridges 2, 3, 6, and 7. Phase 2 of Bridges 6 and 7 are substantially complete! We are in the process of forming the flat slab deck of Bridge 5. #UIG #bridgeconstruction #bridgebuilders #subcontractor #generalcontractor
-
Our Engineering Team participated a few weeks ago in the ASCE North Carolina Section Sporting Clay Event at Rocky Creek and took 1ST PLACE! Congratulations Rett Triplett, PE, Daniel Keener, Ahmad Abufoul, P.E., and Omar Abufoul.
-
The Archer United JV project update on the I-26 Connector project on the northwest side of Columbia, SC. Photo 1 is Segment 1 at Exit 97: AUJV placing fill and aggregate for CMRB on Broad River Rd Photo 2 is Segment 1 WB at Exit 97: AUJV constructing temporary spur at ramp D Photo 3 is Segment 2 EB: AUJV paving dual lanes near exit 91 #aujv #malfunctionjunction #uig #unitedbridgeprojects #scdot #archerwestern The Walsh Group - Walsh Construction & Archer Western